Our References
Company Name | Project | Facility Type | Services |
EKORE RÜZGAR ENERJİSİ A.Ş. | DİKİLİ WPP 5 MW | WPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
Preparation of Turbine Foundation Projects | |||
Preparation of Substation and Switchyard Projects | |||
SİSTEM ALÜMİNYUM SAN. VE TİC. A.Ş. | UNLICENCED WPP DEVELOPMENT | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
Periodical Maintenance | |||
GAZİBEL HİZ.MÜŞ.İNŞ.TİC.A.Ş. | LICENCED WPP DEVELOPMENT | WPP | Site Development for Licensed Power Plant |
Measurement Mast Installation | |||
Daily Data Acquisition | |||
Periodical Maintenance | |||
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Substation and Switchyard Projects | |||
GAZİANTEP B.ŞEHİR BELEDİYESİ | UNLICENCED WPP DEVELOPMENT | WPP | Site Development for Unlicensed Power Plant and Obtaining Connection Invitation |
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
ACWA POWER ENERJİ A.Ş. | EFES WPP (60 MW) SAVAŞTEPE WPP (48,8 MW) KARAMUSALAR WPP ( 59,4 MW) | WPP | Preparation of Bill of Quantities |
ACWA POWER ENERJİ A.Ş. | AVLAĞI,ESKİBEKTAŞLI, OLİMPOS WPP | WPP | Preparation of Bill of Quantities |
MNA ENERJİ A.Ş. | NEW SITE DEVELOPMENT | WPP | Measurement Mast Installation |
Periodical Maintenance | |||
Daily Data Acquisition | |||
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
MERİÇ RÜZGAR ENERJİSİ ELEKTRİK ÜRETİM A.Ş. | HAMZABEYLİ WPP | WPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Expropriation Plans | |||
Preparation of Zoning Plans | |||
Obtaining Forestry Permits | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Substation and Switchyard Projects | |||
Road and Crane Area Projects | |||
Application for Technical Interaction Analysis | |||
MKEK | 5 X 1 MW UNLICENCED WPP DEVELOPMENT | WPP | Measurement Mast Installation |
Periodical Maintenance | |||
Daily Data Acquisition | |||
Micro-sitting | |||
Site Development for Unlicensed Power Plant and Obtaining Connection Invitation | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Soil Survey Reports | |||
Application for Technical Interaction Analysis | |||
AKİŞ-B SOLAR ENERJİ YAT.A.Ş. | NEW SITE DEVELOPMENT | WPP | Measurement Mast Installation |
Periodical Maintenance | |||
Daily Data Acquisition | |||
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
EVRENCİK RÜZGAR ENERJİSİNDEN ELEKTRİK ÜRETİM LTD.ŞTİ. | EVRENCİK WPP | WPP | Preparation of Expropriation Plans |
İÇDAŞ ÇELİK ENERJİ TERSANE VE ULAŞIM SAN. A.Ş. | İÇDAŞ WPP | WPP | Preparation of Turbine Foundation Projects |
TS TÜRKER ENERJİ ÜRETİM VE TİC. A.Ş. | BORDO MAVİ WPP 10 MW | WPP | Preparation of Pre-Licence Application Files and Follow-up |
Measurement Mast Installation | |||
Periodical Maintenance | |||
TS TÜRKER ENERJİ ÜRETİM VE TİC. A.Ş. | TS WPP 10 MW | WPP | Preparation of Pre-Licence Application Files and Follow-up |
Measurement Mast Installation | |||
Periodical Maintenance | |||
AKÇANSA ÇİMENTO SANAYİ VE TİC.A.Ş. | AKÇANSA UNLICENCED WPP 4,15 MW | WPP | Site Development for Unlicensed Power Plant and Obtaining Connection Invitation |
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Application for Technical Interaction Analysis | |||
Preparation of Zoning Plans | |||
Preparation and Approval of Base Maps | |||
Preparation of Soil Conservation Project | |||
Obtaining “Out of EIA Scope” Letter | |||
FİT ENERJİ ÜRETİM YAT.A.Ş. | UNLICENCED WPP PROJECT | WPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
Preparation of Substation and Switchyard Projects | |||
FİT ENERJİ ÜRETİM YAT.A.Ş. | UNLICENCED WPP PROJECT | WPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
Preparation of Substation and Switchyard Projects | |||
ZT ENERJİ ELEKTRİK ÜRETİM A.Ş. | ÇERÇİKAYA WPP | WPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
Preparation of Substation and Switchyard Projects | |||
BİNRES ELEKTRİK ÜRETİM A.Ş. | NEW SITE DEVELOPMENT | WPP | Measurement Mast Installation |
TÜRKİYE SINAİ VE KALKINMA BANKASI | ÖDEMİŞ WPP AND BAĞARASI WPP | WPP | Preparation of Technical Due-Diligence |
KYBELE ENERJİ A.Ş. | NEW SITE DEVELOPMENT | WPP | Measurement Mast Installation |
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
Periodical Maintenance | |||
HANAY ELEKTRİK ÜRETİM A.Ş | ELMALI WPP | WPP | Road and Crane Area Projects |
Preparation of Soil Survey Reports | |||
Obtaining Preliminary Forestry Permit | |||
Preparation of Expropriation Plans | |||
Preparation of Zoning Plans | |||
Application for Technical Interaction Analysis | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Substation and Switchyard Projects | |||
EFİL ENERJİ ÜRETİM SANAYİ VE TİCARET A.Ş. | KARTALDAĞI WPP 63 MW | WPP | Preparation of Zoning Plans |
Preparation of Soil Survey Reports | |||
Road Projects | |||
Preparation and Approval of Ministry of Energy and Natural Resources Preliminary Application File | |||
Application for Technical Interaction Analysis | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation of Turbine Foundation Projects | |||
ARIEN ELEKTRİK ÜRETİM A.Ş. | NEW SITE DEVELOPMENT | WPP | Measurement Mast Installation |
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
Periodical Maintenance | |||
ÖZTEKNOLOJİ BİLGİ YÖN.VE YAZ.SİSTEM PROJE TİC.LTD.ŞTİ. | NEW SITE DEVELOPMENT | WPP | Measurement Mast Installation |
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
Periodical Maintenance | |||
MEGAMETRİK İNŞAAT TURİZM GIDA BİLİŞİM DIŞ TİCARET TİC.LTD.ŞTİ | NEW SITE DEVELOPMENT | WPP | Measurement Mast Installation |
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
Periodical Maintenance | |||
KESİR MÜHENDİSLİK ELEKTRİK MAK.İNŞ.SAN.VE TİC.LTD.ŞTİ. | SÜLOĞLU WPP | WPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
Preparation of Turbine Foundation Projects | |||
HAKAN ERTAN EKORES ENERJİ ELEKTRİK ÜRETİM A.Ş. | NEW SITE DEVELOPMENT | WPP | Site Development for Licensed Power Plant |
Site Development for Licensed Power Plant | |||
BEREKET ENERJİ ÜRETİM A.Ş. | NEW SITE DEVELOPMENT | WPP | Measurement Mast Installation |
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
Periodical Maintenance | |||
Daily Data Acquisition | |||
YENİ BELEN ENERJİ ELEKTRİK ÜRETİM SANAYİ VE TİCARET A.Ş. | ŞENBÜK WPP 27 MW | WPP | Preparation of Substation and Switchyard Projects |
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Turbine Foundation Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
AK-İŞ TAMYELİ ENERJİ YATIRIM ÜRETİM VE TİCARET A.Ş. | İNCESU WPP 10 MW | WPP | Site Development for Licensed Power Plant |
Preparation of Zoning Plans | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation of Turbine Foundation Projects | |||
Road Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
GENPA-TELEKOMUNİKASYON VE İLETİŞİM SAN. A.Ş. | ŞİLE WPP 50 MW | WPP | Preparation of Technical Due-Diligence |
GENPA-TELEKOMÜNİKASYON VE İLETİŞİM SAN A.Ş (KÜTLE ENERJİ) | BAĞARASI WPP 46 MW | WPP | Connection Agreement |
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation and Approval of Base Maps | |||
Preparation of Turbine Foundation Projects | |||
Road Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Substation and Switchyard Projects | |||
Application for Technical Interaction Analysis | |||
Obtaining Treasury Incentive Certificate | |||
Preparation of Zoning Plans | |||
GENPA-TELEKOMÜNİKASYON VE İLETİŞİM SAN A.Ş (TAYF ENERJİ.A.Ş) | ÖDEMİŞ WPP 20 MW | WPP | Connection Agreement |
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation and Approval of Base Maps | |||
Preparation of Turbine Foundation Projects | |||
Road Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Distribution Center Projects | |||
Application for Technical Interaction Analysis | |||
Obtaining Treasury Incentive Certificate | |||
Preparation of Zoning Plans | |||
ARIEN ELEKTRİK ÜRETİM A.Ş. | GAZİ WPP 5 MW | WPP | Measurement Mast Installation |
Preparation and Approval of Base Maps | |||
Carbon Trading Consultancy Services (Obtaining Gold Standard VER Certificate) | |||
Application for Technical Interaction Analysis | |||
Preparation of Soil Survey Reports | |||
Preparation of Expropriation Plans | |||
Preparation of Substation and Switchyard Projects | |||
Road Projects | |||
Preparation of Turbine Foundation Projects | |||
Preparation of Zoning Plans | |||
Obtaining Forestry Permits | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
ARIEN ELEKTRİK ÜRETİM A.Ş. | SAKARBAYIR WPP 3 MW | WPP | Measurement Mast Installation |
Preparation and Approval of Base Maps | |||
Carbon Trading Consultancy Services (Obtaining Gold Standard VER Certificate) | |||
Application for Technical Interaction Analysis | |||
Preparation of Soil Survey Reports | |||
Preparation of Expropriation Plans | |||
Preparation of Substation and Switchyard Projects | |||
Road Projects | |||
Preparation of Turbine Foundation Projects | |||
Preparation of Zoning Plans | |||
Obtaining Forestry Permits | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş ( HACİM ENERJİ A.Ş ) | GEYVE WPP 50 MW | WPP | Preparation and Approval of Base Maps |
Road Projects | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation of Zoning Plans | |||
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş (PAMUKOVA RÜZGAR ENERJİ A.Ş) | PAMUKOVA WPP 20 MW | WPP | Preparation and Approval of Base Maps |
Road Projects | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation of Zoning Plans | |||
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş (BARKAN ENERJİ A.Ş ) | TİRE WPP 50 MW | WPP | Preparation and Approval of Base Maps |
Road Projects | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation of Zoning Plans | |||
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş (ÇEKİM ENERJİ A.Ş) | BOZÜYÜK WPP 90 MW | WPP | Preparation and Approval of Base Maps |
Road Projects | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation of Zoning Plans | |||
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş (YENİ ENERJİ A.Ş) | YENİHİSAR WPP 20 MW | WPP | Preparation and Approval of Base Maps |
Road Projects | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation of Zoning Plans | |||
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş | ZONGULDAK WPP | WPP | Obtaining Forestry Permits |
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş (İLETKEN ENERJİ A.Ş) | GÖKDAĞ WPP 10 MW | WPP | Obtaining Forestry Permits |
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş | GÖLYAKA WPP | WPP | Obtaining Forestry Permits |
Road Projects | |||
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş (BARKAN ENERJİ A.Ş ) | ŞAPDAĞI WPP 55 MW | WPP | Preparation and Approval of Base Maps |
Road Projects | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation of Zoning Plans | |||
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş | GÖLMARMARA WPP | WPP | Obtaining Forestry Permits |
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş | ULUBORLU WPP | WPP | Obtaining Forestry Permits |
Road Projects | |||
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş ( YUVA ENERJİ A.Ş ) | YUVACIK WPP 120 MW | WPP | Preparation and Approval of Base Maps |
Road Projects | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation of Zoning Plans | |||
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş | AFYON 2 WPP | WPP | Obtaining Forestry Permits |
Road Projects | |||
CANKURTARAN ELEKTRİK ÜRETİM A.Ş | CANKURTARAN WPP 10 MW | WPP | Application for Technical Interaction Analysis |
Connection Agreement | |||
Obtaining Treasury Incentive Certificate | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Expropriation Plans | |||
Preparation of Distribution Center Projects | |||
Road Projects | |||
Preparation of Turbine Foundation Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
TÜRKERLER İNŞ. TURİZM MADEN. ENERJİ ÜRETİM TİC. VE SAN. A.Ş ( KİRAZ ENERJİ A.Ş) | KİRAZLI WPP 50 MW | WPP | Preparation and Approval of Base Maps |
Road Projects | |||
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation of Zoning Plans | |||
TÜRKMET ENERJİ ELEKTRİK ÜRETİM İNŞAAT SAN. VE TİC. A.Ş. | KİLYOS WPP | WPP | Preparation and Approval of Base Maps |
Micro-sitting | |||
Measurement Mast Installation | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Expropriation Plans | |||
Preparation of Distribution Center Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
UNIVERSAL LONDON | AKSU RÜZGAR WPP 72MW | WPP | Preparation of Technical Due-Diligence |
UNIVERSAL WİND ENERJİ ELEKTRİK ÜRETİM A.Ş. | İSTANBUL WPP 200 MW | WPP | Measurement Mast Installation |
Periodical Maintenance | |||
Daily Data Acquisition | |||
Micro-sitting | |||
Preparation of Feasibility Reports | |||
TEPERES ELEKTRİK ÜRETİM A.Ş | TEPE WPP 6,85 MW | WPP | Preparation and Approval of Base Maps |
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
AKÇANSA ÇİMENTO SANAYİ VE TİC.A.Ş. | AKÇANSA WPP | WPP | Preparation of Pre-Licence Application Files and Follow-up |
AKENERJİ ELEKTRİK ÜRETİM A.Ş. | SÖKE-ÇATALBÜK WPP 30MW | WPP | Preparation of Technical Due-Diligence |
AKENERJİ ELEKTRİK ÜRETİM A.Ş. | ŞENKÖY WPP 26MW | WPP | Preparation of Technical Due-Diligence |
BORARES ENERJİ A.Ş. | KAROVA WPP 30 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
Micro-sitting | |||
Preparation of Feasibility Reports | |||
Preparation of Pre-Licence Application Files and Follow-up | |||
YILDIZ ENERJİ A.Ş. | GÜLLÜK WPP 51,25 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
Micro-sitting | |||
Preparation of Feasibility Reports | |||
Preparation of Pre-Licence Application Files and Follow-up | |||
ERTAN TARIM HAYVANCILIK VE ENERJİ İSLETMELERİ SANAYİ TİCARET A.Ş. | ERTAN WPP 3 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
Micro-sitting | |||
Preparation of Feasibility Reports | |||
Preparation of Pre-Licence Application Files and Follow-up | |||
Connection Agreement | |||
Preparation of Zoning Plans | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation and Approval of Base Maps | |||
Road Projects | |||
Application for Technical Interaction Analysis | |||
Obtaining Forestry Permits | |||
Preparation of Distribution Center Projects | |||
Preparation of Turbine Foundation Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
MAKTEL RÜZGAR ENERJİ VE ELEKTRİK ÜRETİM DAĞITIM SANAYİ TİCARET A.Ş. | GÖKKOY WPP 36 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
Micro-sitting | |||
Preparation of Feasibility Reports | |||
KARADENİZ HOLDİNG A.Ş | LICENCED WPP DEVELOPMENT | WPP | Site Development for Licensed Power Plant |
AKENERJİ ELEKTRİK ÜRETİM A.Ş. | SALİHLER WPP 120 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
Micro-sitting | |||
Preparation of Feasibility Reports | |||
AKENERJİ ELEKTRİK ÜRETİM A.Ş. | ÇAMLICA WPP 50 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
Micro-sitting | |||
Preparation of Feasibility Reports | |||
AKENERJİ ELEKTRİK ÜRETİM A.Ş. | AYYILDIZ WPP 15 MW | WPP | Road Projects |
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Soil Survey Reports | |||
Site Supervision Service | |||
YİGİT RÜZGAR ENERJİSİNDEN EL. ÜRETİM SANTRALİ LTD. ŞTİ. | KUMRES WPP 10,8 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
EIA Service | |||
Preparation of Pre-Licence Application Files and Follow-up | |||
Preparation and Approval of Base Maps | |||
Preparation of Soil Survey Reports | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Substation and Switchyard Projects | |||
Road and Crane Area Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Zoning Plans | |||
Obtaining Forestry Permits | |||
FC HOLDİNG (YGT ELEKTRİK ÜRETİM SAN. VE TİC. LTD. ŞTİ) | ADARES WPP 10,8 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
Preparation of EMRA License Amendment Files | |||
EIA Service | |||
Preparation of Pre-Licence Application Files and Follow-up | |||
EKSEL ELEKTRİK ÜRETİM SAN. VE TİC. LTD. ŞTİ | ALARES WPP 10,8 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
Preparation of EMRA License Amendment Files | |||
EIA Service | |||
Preparation of Pre-Licence Application Files and Follow-up | |||
SÖKE RÜZGAR ENERJİSİNDEN ELEKTRİK ÜRETİMİ SANTRALİ LTD. ŞTİ. (BEREKET ENERJİ A.Ş) | SÖKE WPP 45 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
EIA Service | |||
Preparation and Approval of Base Maps | |||
Preparation of Soil Survey Reports | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Substation and Switchyard Projects | |||
Road and Crane Area Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Zoning Plans | |||
Obtaining Forestry Permits | |||
YALOVA RÜZGAR ENERJİSİNDEN ELEKTRİK ÜRETİMİ SANTRALİ LTD.ŞTİ. | KARACABEY WPP 27,9 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
EIA Service | |||
Preparation and Approval of Base Maps | |||
Preparation of Soil Survey Reports | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Substation and Switchyard Projects | |||
Road and Crane Area Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Zoning Plans | |||
Preparation of Turbine Foundation Projects | |||
AROVA RES RÜZGAR ENERJİSİNDEN ELEKTRİK ÜRETİM SANTRALI LİMİTED ŞİRKETİ (BEREKET ENERJİ A.Ş) | YALOVA WPP 54 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
EIA Service | |||
Preparation and Approval of Base Maps | |||
Preparation of Soil Survey Reports | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Substation and Switchyard Projects | |||
Road and Crane Area Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Zoning Plans | |||
Obtaining Forestry Permits | |||
AROVA RES RÜZGAR ENERJİSİNDEN ELEKTRİK ÜRETİM SANTRALI LİMİTED ŞİRKETİ (BEREKET ENERJİ A.Ş) | UŞAK WPP 54 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
EIA Service | |||
Preparation and Approval of Base Maps | |||
Preparation of Soil Survey Reports | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Substation and Switchyard Projects | |||
Road and Crane Area Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Zoning Plans | |||
Obtaining Forestry Permits | |||
HEKSAGON YENİLENEBİLİR ENERJİ YATIRIMLARI SAN VE TİC. A.Ş | NEW SITE DEVELOPMENT | WPP | Preparation of Technical Due-Diligence |
AS-YEL ELEKTRİK ÜRETİM LTD. ŞTİ. | KONYA WPP 100 MW | WPP | Measurement Mast Installation |
Daily Data Acquisition | |||
SABAŞ ELEKTRİK ÜRETİM A.Ş. | TURGUTTEPE WPP 24MW | WPP | EIA Service |
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Substation and Switchyard Projects | |||
Road and Crane Area Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Preparation of Zoning Plans | |||
Obtaining Forestry Permits | |||
BAKRAS ENERJİ ELEKTRİK ÜRETİM VE TİC. LTD. ŞTİ. | ŞENBÜK WPP 15 MW | WPP | Preparation of Substation and Switchyard Projects |
Road and Crane Area Projects | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
SANKO (ERTÜRK ELEKTRİK ÜRETİM A.Ş.) | ÇATALCA WPP 60 MW | WPP | Preparation of Feasibility Reports |
Micro-sitting | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Substation and Switchyard Projects | |||
Preparation of Expropriation Plans | |||
Preparation of Zoning Plans | |||
EIA Service | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Site Supervision Service | |||
ERTÜRK ELEKTRİK ÜRETİM A.Ş. | TEPE WPP 0,85 MW | WPP | Preparation of Distribution Center Projects |
Site Supervision Service | |||
SABAŞ ELEKTRİK ÜRETİM A.Ş. | MADRANBABA WPP 19,5 MW | WPP | Preparation of Feasibility Reports |
Micro-sitting | |||
Preparation of Power Transmission Line Cross Sections and Projects | |||
Preparation of Substation and Switchyard Projects | |||
Preparation of Expropriation Plans | |||
EIA Service | |||
AK-EL A.Ş. | ÇAMBEL WPP 66 MW | WPP | Preparation of Power Transmission Line Cross Sections and Projects |
İNNORES ELEKTRİK ÜRETİM LTD.ŞTİ. | YUNTDAG WPP 42,5 MW | WPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Expropriation Plans | |||
BEST A.Ş (SARES LTD. ŞTİ) | SAMANDAĞ WPP 50 MW | WPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Substation and Switchyard Projects | |||
Preparation of Expropriation Plans | |||
EIA Service | |||
BEST A.Ş (AKRES LTD. ŞTİ) | SERTAVUL WPP 46,25 | WPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Substation and Switchyard Projects | |||
Preparation of Expropriation Plans | |||
EIA Service | |||
BEST A.Ş (AKRES LTD. ŞTİ) | AKHİSAR WPP 43,75 MW | WPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Substation and Switchyard Projects | |||
Preparation of Expropriation Plans | |||
EIA Service | |||
Preparation of Zoning Plans | |||
EMERGYA WIND TECHNOLOGIES B.V. (EWT) | LÜDERİZT / NAMİBİA WPP 36 MW | WPP | Macro-sitting |
TUYAT ELEKTRİK ÜRETİM A.Ş. | GÖKSU HPP | HPP | Obtaining Forestry Permits |
Road Projects | |||
Preparation of Expropriation Plans | |||
Preparation of Distribution Center Projects | |||
Preparation of Electrical Projects | |||
SU GRUP ENERJİ YATIRIMLARI İNŞAAT PROJE MÜŞAVİRLİK TİCARET LTD.ŞTİ. | DEREBAŞI HPP 34,5 KV PTL | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation and Approval of Base Maps | |||
SU GRUP ENERJİ YATIRIMLARI İNŞAAT PROJE MÜŞAVİRLİK TİCARET LTD.ŞTİ. | ERİKOĞLU-KESERALİ HPP 34,5 KV PTL | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation and Approval of Base Maps | |||
USAŞ | ÇİMEN HPP | HPP | Preparation of Technical Due-Diligence |
BEREKET ENERJİ ÜRETİM A.Ş. | TOROS HPP 50 MW | HPP | Preparation of Substation and Switchyard Projects |
BEREKET ENERJİ ÜRETİM A.Ş. | GÖKTAŞ HPP I-II 122,2 MW+153,5 MW | HPP | Preparation of Substation and Switchyard Projects |
ELİTE ELEKTRİK ÜRETİM VE MAKİNA SAN. TİC. A.Ş. | PAPART HPP | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Expropriation Plans | |||
Obtaining Forestry Permits | |||
Preparation of Substation and Switchyard Projects | |||
Preparation of Distribution Center Projects | |||
YAĞMUR ENERJİ ELEKTRİK ÜRETİM SANAYİ VE TİCARET A.Ş | NAMNAM HPP | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Expropriation Plans | |||
KARHES LTD. ŞTİ. (BEREKET ENERJİ) | DERELİ HPP 49,10 MW | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Substation and Switchyard Projects | |||
Preparation of Expropriation Plans | |||
EIA Service | |||
KARHES LTD. ŞTİ. (BEREKET ENERJİ) | ÇIRAKDAMI HPP 49,20 MW | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Substation and Switchyard Projects | |||
Preparation of Expropriation Plans | |||
EIA Service | |||
DÜZCE-AKSU HES LTD. ŞTİ. (BEREKET ENERJİ) | AKSU HPP 46,2 MW | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Substation and Switchyard Projects | |||
Preparation of Expropriation Plans | |||
EIA Service | |||
BEREKET ENERJİ ÜRETİM A.Ş. | ADANA-MENTAS HPP 40 MW | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Substation and Switchyard Projects | |||
Tender Evaluation | |||
BEREKET ENERJİ ÜRETİM A.Ş. | DALAMAN-GOKYAR HPP 42 MW | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Substation and Switchyard Projects | |||
Tender Evaluation | |||
YPM ELEKTRİK ÜRETİM A.Ş. | SUŞEHRİ HPP 12 MW | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Expropriation Plans | |||
SU ENERJİ SANAYİ A.Ş.(ENDA HOLDİNG) | ÇAYGÖREN HPP 3,7 MW | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Expropriation Plans | |||
ÖZGÜR ELEKTRİK A.Ş.(BM HOLDİNG) | TAHTA HPP 12,30 MW | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Expropriation Plans | |||
ENOVA A.Ş. | CEYHAN HPP 60 MW | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
KONİ İNŞAAT SANAYİ A.Ş. (AKSA) | ESPİYE-AKKOY HPP 13,36 MW | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Expropriation Plans | |||
BEREKET ENERJİ ÜRETİM A.Ş. | KOYULHİSAR HPP 43,50 MW | HPP | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Substation and Switchyard Projects | |||
YESİLBAŞ ELEK. LTD. ŞTİ. | YEŞİL HPP | HPP | Preparation of Electrical Projects |
DARDANEL ELEKTRİK ÜRETİM A.Ş. | TUZLA GEOTHERMAL POWER PLANT 7,5 MW | GEOTHERMAL | EIA Service |
Obtaining Treasury Incentive Certificate | |||
Carbon Trading Consultancy Services (Obtaining Gold Standard VER Certificate) | |||
KESİR MÜHENDİSLİK ELEKTRİK MAK.İNŞ.SAN.VE TİC.LTD.ŞTİ. | ANTALYA NGCC | THERMAL | Preparation of Electrical Projects |
SİNTEK MADENCİLİK MAKİNE SANAYİ İNŞAAT DANIŞMANLIK VE DIŞ TİCARET LTD. ŞTİ | AŞKALE ÇİMENTO WASTE HEAT PLANT 7,5 MW | THERMAL | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
BURSA ÇIMENTO SAN. VE TİC. A.Ş. | BURSA ÇİMENTO WASTE HEAT PLANT 9 MW | THERMAL | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
Preparation of EMRA Progress Reports | |||
NUH ÇİMENTO SANAYİ A.Ş | NUH ÇİMENTO WASTE HEAT PLANT | THERMAL | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
AKÇANSA ÇİMENTO SANAYİ VE TİC.A.Ş. | AKÇANSA WASTE HEAT PLANT | THERMAL | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ÇİMSA ÇİMENTO SANAYİİ VE TİCARET A.Ş. | ÇIMSA WASTE HEAT PLANT(MERSİN) | THERMAL | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
BATIÇIM BATIANADOLU ÇIMENTO SANAYII A.Ş. | BATIÇIM WASTE HEAT PLANT | THERMAL | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
BATISÖKE SÖKE ÇİMENTO SANAYİİ T.A.Ş | BATISÖKE WASTE HEAT PLANT | THERMAL | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
HAKAN MADENCILIK VE ELEKTRİK ÜRETİM SAN. TIC. A.Ş | HAKAN KOMUR WASTE HEAT PLANT | THERMAL | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
EGEMER ELEKTRİK ÜRETİM A.Ş. | EGEMER NATURAL GAS COMBINED CYCLE POWER PLANT 900 MW | THERMAL | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
Preparation of Power Transmission Line Cross Sections and Projects | |||
EIA Service | |||
Preparation of Expropriation Plans | |||
MB ŞEKER | AUTOPRODUCER PLANT | THERMAL | Preparation of Electrical Projects |
ÇİMSA AFYON ÇİMENTO SAN.TİC.A.Ş. | 154 KV PTL SWITCHYARD | PTL AND SWITCHYARD | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Expropriation Plans | |||
Preparation of Zoning Plans | |||
EIA Service | |||
BEST ELEKTRİK A.Ş. | 400/132/11 KV SWITCHYARD IRAQ | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
METEOROLOJİ GENEL MÜDÜRLÜĞÜ | ELECTRICAL POWER INCREASE | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ÇİMKO ÇİMENTO VE BETON SAN.A.Ş. | CONNECTION AGREEMENT | PTL AND SWITCHYARD | Connection Agreement |
BEST ELEKTRİK A.Ş. | 400/220 KV SWTHCYARD ALGERIA | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
EROĞLU GİYİM SANAYİ TİCARET A.Ş. | EROĞLU GİYİM COGENERATION POWER PLANT | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
KESİR MÜHENDİSLİK ELEKTRİK MAK.İNŞ.SAN.VE TİC.LTD.ŞTİ. | SWITCHYARDS NO 1&2 | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
BEREKET ENERJİ ÜRETİM A.Ş. | GÖKTAŞ 1-2 SS PROJECTS | PTL AND SWITCHYARD | Preparation of Electrical Projects |
TURKOL TURİZM SANAYİ VE TİCARET A.Ş. | TURKOL OTEL THERMAL TRIGENERATION POWER PLANT | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 188 ÇANKIRI OIZ | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | İTM 96 KAYABAŞI SS | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | İTM 91 SİİRT SS | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ÇİMSA ÇİMENTO SANAYİİ VE TİCARET A.Ş. | ÇİMSA 154 KV (ESKİŞEHİR) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 85 (154 KV BALGAT SS (PLANT EXTENSION) AND 380KV İSKENDERUN İKS (SUGÖZÜ) SS (ADANA) (PLANT EXTENSION)) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ÇALIK ENERJİ SANAYİ VE TİCARET A.Ş | AŞKABAT-AST1 16 110 KV SBBSTATION (AIS & GIS), 11 35 KV SUBSTATION AND 97 10 KV SUBSTATION AND PTL PROJECTS | PTL AND SWITCHYARD | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Substation and Switchyard Projects | |||
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 91 (380/154/33 KV SİİRT SS) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 82 (154/33 KV KARABÜK OIZ SS – KARABÜK (NEW)) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 78 (380/33 KV GEBZE (TEPEÖREN) SS – KOCAELİ (PLANT EXTENSION)) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 77 (KAYABAŞİ TOKİ SS ) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 75 (ADAPAZARİ SS 380 KV SWITCHYARD) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 62 (380 KV BURSA NATURAL GAS COMBINED CYCLE POWER PLANT) | PTL AND SWITCHYARD | Preparation of Substation and Switchyard Projects |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 62 (154 KV İNEBOLU TEİAŞ SS | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM (154 KV İÇTAŞ SS) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 70 (154/33 KV URLA HAVZA (URLA-2) SS) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 70 (154/33 KV SİVRİHİSAR SS) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 70 (154/33 KV GÖLCÜK (TEKNİKÖY) SS) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 70 (154/33 KV DİNAR OIZ SS) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 70 (154/33 KV ÇAĞLAYAN HAVZA SS) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 70 (154/33 KV BOZÜYÜK OIZ SS) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ANADOLU ELEKTRİK SAN. VE TİC. A.Ş | ITM 70 (380/154 KV MANİSA OIZ SS) | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
KURTMAKAS MÜHENDİSLİK ELK.MÜH.TUR.İNŞ.TAAH.SAN.VE TİC.LTD.ŞTİ. | ITM YOZGAT / YERKÖY SS | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
DESAT EGE AKDENIZ ELEKTRİK MEKANİK İNŞAAT TAAHHÜT SANAYİ VE TİCARET LİMİTED ŞİRKETİ | META NİKEL KOBALT MADENCİLİK A.Ş GRID CONNECTION PROJECT | PTL AND SWITCHYARD | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
EIA Service | |||
Preparation of Substation and Switchyard Projects | |||
MSC MEHMET SEZAI ÇAKMAK İNŞAAT ENERJİ LTD.ŞTİ | FIRAT PLASTIK | PTL AND SWITCHYARD | Preparation of Power Transmission Line Cross Sections and Projects |
Preparation of Expropriation Plans | |||
NEW HIRGIGO BAY OIL JETTY,MASSAWA,ERITREA / SOYUT YAPI & MÜHENDİSLİK A.Ş | PREPARATION OF BATHYMETRIC MAPS | CIVIL | Preparation of Bathymetric Maps |
Preparation of Electrical Projects | |||
ERV ELEKTRİK ENERJİSİ ÜRETİM A.Ş. YARPUZ YATIRIM A.Ş. SER ENERJİ A.Ş. | 4 UNLICENCED SPP DEVELOPEMENT | SPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
Preparation and Approval of Base Maps | |||
Preparation of Zoning Plans | |||
NATUREL ENERJİ | 3 SPP PROJECTS DEVELOPMENT (TOTAL OF 10,6 MW) | SPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
Preparation of Power Transmission Line Cross Sections and Projects | |||
NATUREL ENERJİ | GÖLBAŞI SPP 2,6 MW | SPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
Preparation of Power Transmission Line Cross Sections and Projects | |||
IC İÇTAŞ HİDROELEKTRİK VE TERMİK ENERJİ ÜRETİM VE TİC. A.Ş. | SPP PROJECT DEVELOPMENT | SPP | Energy Generation Calculations |
ÇALIK DIAMOND ELEKTRİK A.Ş. | ERZİNCAN 5 X 1 MW UNLICENCED SPP PROJECTS DEVELOPMENT | SPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ÇALIK DIAMOND ELEKTRİK A.Ş. | ÇORUM 9 X 1 MW UNLICENCED SPP PROJECTS DEVELOPMENT | SPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
ÇALIK DIAMOND ELEKTRİK A.Ş. | AMASYA 11X 1 MW UNLICENCED SPP PROJECTS DEVELOPMENT | SPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
TURKAY ALTERNATİF ENERJİDEN ELEKTRİK ÜRETİMİ SAN.VE TİC.A.Ş. | NEW SITE DEVELOPMENT | SPP | Energy Generation Calculations |
PARAGON ENERJİ ÜRETİM SANAYİ TİC.A.Ş. | SOLAR MEASUREMENTS | SPP | Measurement Mast Installation |
Daily Data Acquisition | |||
Periodical Maintenance | |||
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
EKOS GRUP-EKOSİNERJİ ELEK.SAN.VE TİC. A.Ş. | UNLICENCED SPP PROJECT | SPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
HALK ENERJİ A.Ş. | 3 X 1 MW SPP PROJECT | SPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
HALK ENERJİ A.Ş. | 1 MW SPP PROJECT | SPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
HALK ENERJİ A.Ş. | ROOF SOLAR POWER SYSTEMS | SPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
HALK ENERJİ A.Ş. | 5 X 1 MW SPP PROJECT | SPP | Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |
SARAY BİSKÜVİ VE GIDA SANAYİ A.Ş. | KONYA-KARAMAN (SARAY SPP 20 MW) | SPP | Site Development for Licensed Power Plant |
Measurement Mast Installation | |||
Daily Data Acquisition | |||
Periodical Maintenance | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
ARIEN ELEKTRİK ÜRETİM A.Ş. | KAYSERİ – NİĞDE (ARIEN SPP 10 MW) | SPP | Site Development for Licensed Power Plant |
Measurement Mast Installation | |||
Daily Data Acquisition | |||
Periodical Maintenance | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
ATOM ELEKTRİK ÜRETİM A.Ş | KAYSERİ – NİĞDE (ATOM SPP 10 MW) | SPP | Site Development for Licensed Power Plant |
Measurement Mast Installation | |||
Daily Data Acquisition | |||
Periodical Maintenance | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
TURKAY ALTERNATİF ENERJİDEN ELEKTRİK ÜRETİMİ SAN.VE TİC.A.Ş. | ISPARTA -ANTALYA | SPP | Site Development for Licensed Power Plant |
Measurement Mast Installation | |||
Daily Data Acquisition | |||
Periodical Maintenance | |||
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
KÜTAHYA ELEKTRİK ÜRETİM VE DAĞITIM SAN.A.Ş. | KAYSERİ DEVELİ (SEVİM1 5 MW) | SPP | Site Development for Licensed Power Plant |
Measurement Mast Installation | |||
Daily Data Acquisition | |||
Periodical Maintenance | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
Obtaining Mast Installation Approval and Final Data Report from General Directorate of Meteorology | |||
YİĞİT RÜZGÂR ENERJİSİNDEN ELEKTRİK ÜRETİMİ SANAYİ VE TİCARET LTD. ŞTİ. | NEVŞEHİR ÜRGÜP 5 MW | SPP | Site Development for Licensed Power Plant |
Measurement Mast Installation | |||
Daily Data Acquisition | |||
Periodical Maintenance | |||
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) | |||
KARAÇAY ELEKTRİK ÜRETİM SAN.VE TİC. A.Ş. | NİĞDE MERKEZ (KARAATLI SPP) | SPP | Site Development for Licensed Power Plant |
Preparation of Electrical, Civil, Mechanical Projects (Including Related Approvals) |